loading
ZPET are professional for the cold coffee brewing equipment,from home brew to the commercial coffee brewing system,to max your brewing efficiency with completely customized coffee brewing system
Availability: | |
---|---|
Brewing Configuration
Commercial Cold Coffee Brewing Equipment
ZPET are professional for the cold coffee brewing equipment,from home brew to the commercial coffee brewing system,to max your brewing efficiency with completely customized coffee brewing system
We design ,fabricate and install cold coffe brewing equipment and fermentation tank for the coffee company.
ZPET Cold Brew Coffee Equipment Line:
Coffee Extraction Systems for largescale cold brew coffee production.
Our commercial cold brew coffee equipment is specifically designed for large quantities of continuous cold brew coffee production.
There are the main parts for the cold coffee brewing system as follows:
Coffee Extraction Systems
Coffee Holding & Conditioning Tanks
Coffee Steeping and Extraction Systems,200L-5000L Optional
Material: SUS304 Stainless Steel
Double wall tanks with insulation.
Equip with cooling jacket to guaranteed cold brewing
Equip with 280 or 400 micron sieve plate for filtering
Equip with work plateform for easy operate
Equip with CIP ball for the tank cleaning
Equip with PT-100 for the temperature display on the controller
Side manway for easy removal of coffee grounds
Equip with auto spent coffee grounds removal via plow
Controller panel on the platform
Stainless steel filter housing with a nylon filter bag
Secondary 35 gallon external filter, Various micron bags available
All the pipe and valve including
Coffee Holding & Conditioning Tanks, 200L-10000L Optional
ZPET Holding & Conditioning Tanks offer unmatched flexibility, allowing customization in size, shape, and fittings, along with a stacking option for space efficiency.
Superior Quality and Sanitary Assurance: Made from certified stainless-steel with 100% TIG welded joints and a sanitary interior, these tanks ensure durability and purity, suitable for various industries.
Precision Temperature Control: Equipped with advanced temperature control features, these tanks are ideal for maintaining the quality and consistency of temperature-sensitive products in sanitary processing industries.
Pressure Type fermentation tank
Double wall tank with insulation
Equip with cooling jacket to control the temperature of the holding tank
Equip with CIP ball for the tank cleaning
Equip with PT-100 for the temperature display on the controller
Equip with sample valve and level gauge
Equip with pressure valve and pressure gauge
Equip with safety valve on the top of the tank
All the pipe and valve including
One-stop Cold coffee brewing system service
Whether it is for a commercial enterprise or for larger scale home brewing production, we are able to provide you with a one-stop service for the equipment and Cold coffee brewing supplies you need.
Welcome to consult for the Cold coffee brewing system from ZPET
Product Advantage
All Construction is from SUS 304 food grade stainless steel, all pipes are SUS304
All signs & wording in English
All tanks to be supplied with Data Plates including Test Data & Serial Number
All tanks will be tested and inspected in the NDT room after construction & Quality Control Checks
All jackets will be tested using water pressure testing, testing pressure: 0.4Mpa (4 Bar) & working pressure:0.2Mpa (2Bar)
All tanks will be pressure tested for 48hours before leaving the ZPET factory;
All the welds are full TIG welded by water spray method to ensure uniform weld pattern with full pickling & passivation
All tanks are mirror polishing inside, to be Ra 0.4um.
All Gaskets are manufactured with EPDM
Trading Terms
Payment Term:
T/T transfer, 40% advance payment in order to start production,
T/T transfer 60% before the equipment is shipped.
Alibaba trader assurance is available to guarantee your payment safety.
Delivery Term:
The manufacturing time is 30 – 45 working days, and will be commenced as soon the initial 40% deposit is received in ZPET account and technical drawings are signed & confirmed by the client
The technical files, layouts, drawings and all other technical confirmation time(s) shall not be included in the manufacturing time.
Production will not start until all drawings, technical files or layouts are confirmed & signed by appropriate party. This can lead to delays in production and / or delivery time if not completed.