loading
3000L brewery equipment was widely used in brewery
The whole brewing system including Grist miller,brewhouse,fermentation tank,cooling system,CIP and Controller,the equipment can be also customized
Availability: | |
---|---|
Brewing Configuration
3000L Brewery Equipment
A commercial brewery is focus on regional market. The capacity request is not so high than micro breweries. Their beers are always sold on shelf in bottle or canning. We are involved in providing different types of medium scale industrial breweries to clients worldwide. The output is mainly 15kL, 20kL, 30kL, 50kL per working day. The complete setup of these breweries is in compliance with modern brewery standards and specifications. These products enable systematic execution of milling, mashing, fermentation, filtration, filling and other related processes. We subject each brewing system to stringent testing procedures before launching them in the market.
Specifications
Output/Brew | 3000L |
Brews/Day | 2~4 |
Output/Month | 100bbl~200bbl |
Electric Supply | 3phase/380(220, 415,440)v/50 (60)Hz |
Heating Source | Steam/Directly Fired |
Area Request | >700M2 |
Brewmaster | 5 |
Note: 1hl=100liter; 1Gallon=3.7854liter; 1Barrel (BBL) =117Liter;
Configuration
1. Malt Milling Unit
Particle adjustable rolling crusher
Flexible or steel auger to directly lift the milled grain to mash tun
2.3000L Brewhouse Unit
Mash tun, Lauter tun, Boiling Kettle, Whirlpool tun in various combination
Hot water tank and cold water tank for optional in special combinations
Infusion or decoction brewing methods are designed exactly
Stainless steel are popular because of easy maintenance and clean, copper cladding for optional
Two stages or single stage heat exchanger for wort cooling
Completely stainless steel integrated work platform
Sanitary and efficiency wort pump
All pipings and fittings
3.3000L or 6000L Fermentation Unit
Standard stainless steel conical cylindrical fermentation tanks
Single size or double size as brewhouse is common used in microbreweries
Tanks quantity is exactly calculated by fermentation cycle for various beers
All manhole, valves, pressure gauges, fittings etc are included
4.Beer Filter Unit
Craft beer is no need filtration which will keg filling for quickly consumption
Plate-Frame or Candle type DE (diatomite earth) filter is used for clarify the beer
5.3000L or 6000L Bright Beer Tank Unit
Standard stainless steel bright tanks for beer maturation, conditioning, service, carbonation
Single size or double size as fermenter is common used in restaurant or bar
Tanks quantity is exactly calculated for various beers and the function
All manhole, valves, stone, gauges, fittings etc are included
6.Cooling Unit
Insulated glycol water tank with or without copper coil for glycol liquid holding and mixing
Efficiency chillers or refrigerators with freon to supply cooling energy
Sanitary centrifugal pump for glycol water recycle among tanks and heat exchanger
All pipes, fitting, insulation materials are included
7.Controlling Unit
Electrical controlling cabinet with temperature, on-off controlling for brewhouse
Electrical controlling cabinet with temperature, on-off controlling for cooling parts
Temperature controller, thermocouple, solenoid valves etc are included
PLC with touch screen panel for special request
8.Beer Dispense
Keg filling and rinsing machine
Semiauto bottling machine with rinsing, filling, capping, labeling etc
Flash pasteurizer or tunnel pasteurizer is available
9.Other Facilities
Portable or fixed CIP system for cleaning the tanks
Steam boiler for brewhouse heating
Water treatment for brew water
Oil free air compressor
Product Video
Product Advantage
All Construction is from SUS 304 food grade stainless steel, all pipes are SUS304
All signs & wording in English
All tanks to be supplied with Data Plates including Test Data & Serial Number
All tanks will be tested and inspected in the NDT room after construction & Quality Control Checks
All jackets will be tested using water pressure testing, testing pressure: 0.4Mpa (4 Bar) & working pressure:0.2Mpa (2Bar)
All tanks will be pressure tested for 48hours before leaving the ZPET factory;
All the welds are full TIG welded by water spray method to ensure uniform weld pattern with full pickling & passivation
All tanks are mirror polishing inside, to be Ra 0.4um.
All Gaskets are manufactured with EPDM
Trading Terms
Payment Term:
T/T transfer, 40% advance payment in order to start production,
T/T transfer 60% before the equipment is shipped.
Alibaba trader assurance is available to guarantee your payment safety.
Delivery Term:
The manufacturing time is 30 – 45 working days, and will be commenced as soon the initial 40% deposit is received in ZPET account and technical drawings are signed & confirmed by the client
The technical files, layouts, drawings and all other technical confirmation time(s) shall not be included in the manufacturing time.
Production will not start until all drawings, technical files or layouts are confirmed & signed by appropriate party. This can lead to delays in production and / or delivery time if not completed.