You are here: Home » Beverage Equipment » Cold Coffee Brewing Equipment » Commercial Cold Coffee Brewing Equipment

loading

Commercial Cold Coffee Brewing Equipment

Share to:
wechat sharing button
facebook sharing button
twitter sharing button
line sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

ZPET are professional for the cold coffee brewing equipment,from home brew to the commercial coffee brewing system,to max your brewing efficiency with completely customized coffee brewing system

Availability:

Brewing Configuration

Commercial Cold Coffee Brewing Equipment

ZPET are professional for the cold coffee brewing equipment,from home brew to the commercial coffee brewing system,to max your brewing efficiency with completely customized coffee brewing system

We design ,fabricate and install cold coffe brewing equipment and fermentation tank for the coffee company.

ZPET Cold Brew Coffee Equipment Line:

Coffee Extraction Systems for largescale cold brew coffee production.

Our commercial cold brew coffee equipment is specifically designed for large quantities of continuous cold brew coffee production.

There are the main parts for the cold coffee brewing system as follows:

  1. Coffee Extraction Systems

  2. Coffee Holding & Conditioning Tanks


Coffee Steeping and Extraction Systems,200L-5000L Optional

  1. Material: SUS304 Stainless Steel

  2. Double wall tanks with insulation.

  3. Equip with cooling jacket to guaranteed cold brewing

  4. Equip with 280 or 400 micron sieve plate for filtering

  5. Equip with work plateform for easy operate

  6. Equip with CIP ball for the tank cleaning

  7. Equip with PT-100 for the temperature display on the controller

  8. Side manway for easy removal of coffee grounds

  9. Equip with auto spent coffee grounds removal via plow

  10. Controller panel on the platform

  11. Stainless steel filter housing with a nylon filter bag

  12. Secondary 35 gallon external filter, Various micron bags available

  13. All the pipe and valve including

Cold Coffee Brewing Equipment

Coffee Holding & Conditioning Tanks, 200L-10000L Optional

ZPET Holding & Conditioning Tanks offer unmatched flexibility, allowing customization in size, shape, and fittings, along with a stacking option for space efficiency.

Superior Quality and Sanitary Assurance: Made from certified stainless-steel with 100% TIG welded joints and a sanitary interior, these tanks ensure durability and purity, suitable for various industries.

Precision Temperature Control: Equipped with advanced temperature control features, these tanks are ideal for maintaining the quality and consistency of temperature-sensitive products in sanitary processing industries.

  1. Pressure Type fermentation tank

  2. Double wall tank with insulation

  3. Equip with cooling jacket to control the temperature of the holding tank

  4. Equip with CIP ball for the tank cleaning

  5. Equip with PT-100 for the temperature display on the controller

  6. Equip with sample valve and level gauge

  7. Equip with pressure valve and pressure gauge

  8. Equip with safety valve on the top of the tank

  9. All the pipe and valve including

pressure

One-stop Cold coffee brewing system service

Whether it is for a commercial enterprise or for larger scale home brewing production, we are able to provide you with a one-stop service for the equipment and Cold coffee brewing supplies you need.

Welcome to consult for the Cold coffee brewing system from ZPET


Product Advantage

All Construction is from SUS 304 food grade stainless steel, all pipes are SUS304
All signs & wording in English
All tanks to be supplied with Data Plates including Test Data & Serial Number
All tanks will be tested and inspected in the NDT room after construction & Quality Control Checks
All jackets will be tested using water pressure testing, testing pressure: 0.4Mpa (4 Bar) & working pressure:0.2Mpa (2Bar)
All tanks will be pressure tested for 48hours before leaving the ZPET factory;
All the welds are full TIG welded by water spray method to ensure uniform weld pattern with full pickling & passivation
All tanks are mirror polishing inside, to be Ra 0.4um.
All Gaskets are manufactured with EPDM

Trading Terms

Payment Term:

T/T transfer, 40% advance payment in order to start production,
T/T transfer 60% before the equipment is shipped.
Alibaba trader assurance is available to guarantee your payment safety.


Delivery Term:

The manufacturing time is 30 – 45 working days, and will be commenced as soon the initial 40% deposit is received in ZPET account and technical drawings are signed & confirmed by the client
The technical files, layouts, drawings and all other technical confirmation time(s) shall not be included in the manufacturing time.

Production will not start until all drawings, technical files or layouts are confirmed & signed by appropriate party. This can lead to delays in production and / or delivery time if not completed.



Previous: 
Next: 
ZPET has distinguished itself as the Asia brewing equipment manufacturer.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 Shun hua Road, Lixia District, Jinan City, Shandong Province, China
  allen2712
Copyright   2021 Shandong ZhongPi Machinery Equipment Co.,Ltd.  Support by  Sdzhidian   Sitemap